Apollo Gold Corporation ("Apollo”
or the "Company”)
(TSX:APG)(AMEX:AGT) announced today net income of $0.5 million, or $0.00
per share, for the three months ended September 30, 2008, as compared to
net income of $2.1 million, or $0.01 per share, for the three months
ended September 30, 2007. Net income for the nine months ended September
30, 2008 was $2.9 million, or $0.02 per share, compared to a net loss of
$0.1 million, or $0.00 per share, for the same period in 2007. Unless
otherwise indicated, all Dollar amounts are reported in US currency.
R. David Russell, President and CEO of Apollo, said, "Montana
Tunnels had a good production quarter and I am pleased with the
financial results given the significant decrease we saw in the prices of
silver, lead and zinc. At Black Fox we made significant progress in the
quarter, we obtained all necessary permits, we completed the purchase of
the mill, we have started developing the open pit, mining and mill
equipment is on order, the refurbishment of the mill is underway and the
last piece of the puzzle, the project financing is slower than we
originally anticipated but we are working hard on completion. Projected
mine start up is March 2009 and mill start up and processing of ore is
April 2009 with a goal of reaching the design capacity of 1,500 tonnes
of ore per day before the end of the second quarter 2009.”
Third Quarter Highlights and Other
Recent Developments
Corporate
On July 1, 2008, we announced that Montana Tunnels Mining, Inc., our
wholly owned subsidiary, had entered into a $5.15 million extension of
an existing debt facility with RMB. The primary use of funds from this
extended facility was the payment of Cdn$4.0 million to St Andrew
Goldfields Ltd. ("St Andrew”)
as a partial payment of the purchase price for the Stock Mill Complex.
On July 24, 2008, we completed an offering ("Unit
Offering”) of equity units ("Units”).
A total of 40,806,500 Units were subscribed for at a price of Cdn$0.50
per Unit (US$0.495 per Unit for purchasers residing in the United
States), for total gross proceeds of Cdn$20.2 million and US$0.2
million. Each Unit is comprised of one common share and one-half of one
common share purchase warrant (a "Warrant”),
with each whole Warrant exercisable into one common share at a price of
Cdn$0.65 per share for 36 months.
On August 21, 2008, we completed an offering of 17,000,000 flow-through
common shares ("Flow-through Offering”)
for purposes of the Income Tax Act (Canada) at Cdn$0.50 per common share
for net proceeds of $7.5 million (Cdn$7.8 million). In connection with
this offering, 1,020,000 share purchase warrants were issued to the
agent. Each share purchase warrant is immediately exercisable at
Cdn$0.50 per common share of the Company and expires on August 21, 2010.
We intend to use the gross proceeds of the private placement for the
pre-strip of the Black Fox open pit mine and to incur Canadian
Exploration Expenses (as defined under the Income Tax Act (Canada)) at
our Black Fox Project.
In May 2008, we retained Macquarie Bank Ltd. and RMB Resources Inc. as
joint arrangers (the "Banks”)
and underwriters for the Black Fox project finance facility. The Banks
have conducted extensive due diligence and this process is nearing
completion. Following completion of due diligence, Apollo and the Banks
will be in a position to proceed with credit committee approvals and
negotiation of definitive documents.
Black Fox
Purchase of the Stock Mill Complex –
On July 28, 2008, the Company completed the acquisition of the Stock
Mill Complex from St Andrew, a significant shareholder of the Company,
for a purchase price of $19.6 million cash (Cdn$20.1 million). The Stock
Mill Complex, which we now refer to as the Black Fox mill complex,
includes a mill and related land, equipment, infrastructure, laboratory
and tailings facilities, located near Timmins, Ontario. The Company
intends to use the Black Fox mill complex to process ore mined at the
Black Fox mine, which is approximately 30 kilometers from the Black Fox
mill complex. In connection with the acquisition of the Black Fox mill
complex, Apollo agreed to assume certain contractual liabilities of St
Andrew and environmental liabilities relating to events after the
closing of the acquisition and is required to refund St Andrew its
bonding commitment at the Black Fox mill complex in the amount of
approximately $1.1 million (Cdn$1.2 million) by July 28, 2009. As of
July 28 and September 30, 2008, St Andrew held approximately 30.6
million and 29.5 million common shares of the Company, respectively
(14.0% and 13.4% of the outstanding common shares, respectively).
Mine Development
– Since April 2008,
when we completed the bankable feasibility study on the Black Fox mine,
we have made progress at Black Fox on a number of fronts. Specifically,
we have received all necessary permits and approvals required to
commence mining activities, initiated removal of the glacial till
material which overlays the open it and begun placing orders for the
long lead time items required to upgrade the Black Fox mill complex.
Consequently, assuming we obtain the necessary financing, mining of the
Black Fox open pit is expected to commence in March 2009.
On October 23, 2008, we commenced removal of the glacial till material
which overlays the open pit. This removal is scheduled to be completed
in May 2009. Apollo has placed orders for the long lead time mining
equipment, and all items required to commence mining are scheduled to be
on site in January and February 2009. We expect that, by the second
quarter of 2009, the open pit will produce 1,500 tonnes of ore per day,
which will be sufficient to feed the mill. Based on this assessment, we
have decided to defer underground mining to periods after 2009.
Mill Complex
– We recently reviewed
the costs associated with upgrading the Black Fox mill complex to
process 1,500 tonnes of ore per day (1,650 tonnes at a 90%
availability). It is estimated that the cost of the upgrade would be
$17.0 million, for which we need to obtain financing, and that the
upgrade could be completed by April 2009.
Apollo is currently in the process of placing orders for the long lead
time items required for mill upgrade, with the key item being a new 12ft
x 18ft 1200 kw ball mill to enhance the grinding circuit, which is
scheduled to arrive in March 2009.
Commitments - As of September 30, 2008, we had committed to lease
$8.7 million of mining equipment and expend an additional $1.1 million
for improvements to the Black Fox mill complex. As of November 10, 2008,
we had (1) committed to lease an additional $4.8 million of mining
equipment for use at Black Fox, (2) contracted the pre-strip of alluvial
waste for $12.2 million, (3) contracted the construction of waste water
ponds for $3.7 million and (4) made additional commitments to expend
$1.4 million for improvements to the mill.
Montana Tunnels
During the third quarter 2008, approximately 2,454,000 tons were mined,
of which 1,824,000 tons were ore. The mill processed 1,221,000 tons of
ore at an average throughput of 13,300 tons per day for the quarter. As
at September 30, 2008, the ore stockpile sitting alongside the mill was
1,982,000 tons. Payable production in the third quarter was 14,600
ounces of gold, 144,000 ounces of silver, 4,586,000 pounds of lead and
9,623,000 pounds of zinc. Apollo’s share of
this production is 50%.
|
Grade:
|
|
|
|
|
|
|
Recoveries:
|
|
|
|
Gold ounces per ton
|
|
0.0154
|
|
|
|
|
Gold
|
|
81.20%
|
|
Silver ounces per ton
|
|
0.1811
|
|
|
|
|
Silver
|
|
82.80%
|
|
Lead %
|
|
0.2292
|
|
|
|
|
Lead
|
|
83.98%
|
|
Zinc %
|
|
0.6261
|
|
|
|
|
Zinc
|
|
82.48%
|
Total cash costs for the third quarter 2008 on a by-product basis were
$471 per ounce of gold and on a co-product basis they were $666 per
ounce of gold, $9.40 per ounce of silver, $0.69 per lb of lead and $0.59
per lb of zinc. For the third quarter 2008, the higher cash costs per
ounce of gold on a by-product basis compared to the third quarter 2007
are the result of (1) 37% higher direct costs related to higher cost of
consumables such as diesel fuel and (2) a 19% reduction in by-product
credits due to lower zinc and lead prices.
During the third quarter 2008, the joint venture spent $0.1 million on
capital expenditures. Apollo’s share of these
capital expenditures is 50%. Also in the third quarter 2008, the joint
venture distributed $3.0 million to its principals, 54% of which went to
Apollo and 46% of which went to Elkhorn.
Cessation of Mining at Montana Tunnels - On October 22, 2008, we
announced that, as at the end of November 2008, we will have completed
mining of ore from the Montana Tunnels open pit operation as permitted
by the current "L Pit”
permit. Upon completion of ore mining at the Montana Tunnels mine, we
estimate that we will have a stockpile of over two million tons of ore,
which we believe is sufficient feed for the Montana Tunnels mill to
continue to produce zinc-gold and lead-gold concentrates for
approximately five more months.
We have applied for the necessary permits to expand the current pit,
which expansion plan is referred to as the "M
Pit project,” and are awaiting the necessary
approvals. The permits for the M Pit project would allow Montana Tunnels
to begin a 12 month pre-stripping program that would cost approximately
$70 million, during which time no ore would be produced. We are not
currently engaged in discussions with financing sources for our $35
million share of the financing costs. The decision to proceed with the M
Pit project must be agreed to by both Apollo and Elkhorn Tunnels, LLC,
our joint venture partner at the mine. Apollo and our joint venture
partner have not yet made a production decision on the M Pit project and
such decision will depend, among other things, on the following factors:
· receipt of the necessary permits for the M
Pit project;
· securing financing for the $70 million; and
· prices of gold, silver, lead and zinc and
available smelter terms.
Huizopa Project
On August 14, 2008, we announced the results of the core drilling
program on the Puma de Oro Exploration target. Twenty five NQ core holes
were drilled on a north-trending zone targeted for drilling based on
Apollo’s geochemical sampling and geologic
mapping. Anomalous gold and silver was found in twenty of the holes with
six of the twenty holes having significant gold and silver values.
The next drill program is scheduled for 2009 and, in the meantime, we
are working on completing a Canadian National Instrument 43-101 for the
Huizopa property.
Consolidated Financial Results Summary
|
(All Dollars in US, 000's, except per share data)
|
Three months ended
September 30,
|
|
Nine months ended
September 30,
|
|
|
2008
|
|
2007
|
|
2008
|
|
2007(1)
|
|
|
Revenues from sale of minerals for the period
|
$12,764
|
|
$11,863
|
|
$38,685
|
|
$27,594
|
|
|
Net income (loss) for the period
|
$ 548
|
|
$ 2,117
|
|
$ 2,873
|
|
($ 94
|
)
|
|
|
|
|
|
|
|
|
|
|
Basic and diluted net income (loss) per share (US$)
|
$ 0.00
|
|
$ 0.01
|
|
$ 0.02
|
|
($ 0.00
|
)
|
(1) Revenues in the first quarter of 2007 only include the month of
March as milling was restarted on March 1, 2007 after being shut down
since May of 2006.
Conference Call
The Company’s management will host the
quarterly earnings conference call on Friday, November 14, 2008 at
9:00am MST (8:00am PST and 11:00am EST). The 2008 third quarter 10-Q
will be available on the Company website at www.apollogold.com.
Conference Call Details:
Call-in Number – North America (877) 407-8031
Call-in Number – International (201) 689-8031
Apollo Gold Corporation
Apollo is a gold mining and exploration company which operates the
Montana Tunnels mine, which is a 50% joint venture with Elkhorn Tunnels,
LLC, in Montana, the Black Fox advanced stage development project in
Ontario, Canada, and the Huizopa project, an early stage exploration
project in the Sierra Madres in Chihuahua, Mexico.
FORWARD-LOOKING STATEMENTS
This press release includes "Forward-Looking
Statements” within the meaning of section 21E
of the United States Securities Exchange Act of 1934, as amended.
Forward-looking statements can be identified by the use of words such as "may,”
"should,”
"expects,”
"plans,”
"anticipates,”
"believes,”
"estimates,”
"schedules,”
"predicts,”
"intends,”
"continue,”
or the negative of such terms, or other comparable terminology. All
statements regarding: future financing of the Black Fox project
including the timing of any financing, timing of the commencement of
mining the open pit at Black Fox, timing of the completion of alluvial
till/overburden removal, cost estimates to upgrade the Black Fox mill
complex, the cessation of mining and milling at the Montana Tunnels
mine, estimates of the size of stockpiled are at the Montana Tunnels
mine upon cessation of mining, timing and costs associated with any M
Pit expansion at the Montana Tunnels mine, and future drill plans and
completion of an NI 43-101 report for the Huizopa property are
forward-looking statements that involve various risks and uncertainties.
There can be no assurance that such statements will prove to be accurate
and actual results and future events could differ materially from those
anticipated in such statements. Important factors that could cause
actual results to differ materially from these forward-looking
statements include: difficulties or delays in permitting at Black Fox,
results of drilling and other exploration activities at Huizopa, and
other factors disclosed under the heading "Risk
Factors” in Apollo’s
most recent annual report on Form 10-K filed with the United States
Securities and Exchange Commission and elsewhere in Apollo’s
documents filed from time to time with the Toronto Stock Exchange, The
American Stock Exchange, The United States Securities and Exchange
Commission and other regulatory authorities. All forward-looking
statements included in this press release are based on information
available to Apollo on the date hereof. Apollo assumes no obligation to
update any forward-looking statements.
NON-GAAP FINANCIAL MEASURES
The term "total cash costs”
is a non-GAAP financial measure and is used on a per ounce of gold
basis. Total cash cost is equivalent to direct operating cost as found
on the Consolidated Statements of Operations and includes by-product
credits for payable silver, lead, and zinc production. We have included
total cash cost information to provide investors with information about
the cost structure of our mining operation. This information differs
from measures of performance determined in accordance with GAAP in
Canada and in the United States and should not be considered in
isolation or as a substitute for measures of performance prepared in
accordance with GAAP. This measure is not necessarily indicative of
operating profit or cash flow from operations as determined under GAAP
and may not be comparable to similarly titled measures of other
companies.