General Dynamics Electric Boat awarded $1.3 billion contract modification for long lead time material for Virginia-class submarines
Werte in diesem Artikel
GROTON, Conn., Aug. 5, 2024 /PRNewswire/ -- General Dynamics Electric Boat, a business unit of General Dynamics (NYSE: GD), announced today it has been awarded a $1.3 billion undefinitized contract modification allowing Electric Boat to purchase long lead time materials for Virginia Class Block VI submarines as detailed in the U.S. Department of Defense contract award.
"This contract modification sends a crucial demand signal, enabling our suppliers to invest in the capacity and materials needed to increase production volume," said Kevin Graney, president of General Dynamics Electric Boat. "Consistent funding for the supply base is essential to achieve the high-rate production the Navy requires of the entire submarine enterprise."
Virginia-class submarines are designed from the keel up for the full range of 21st-century mission requirements, including anti-submarine and surface ship warfare and special operations support. General Dynamics Electric Boat is the prime contractor and lead design yard for the Virginia class and constructs them in a teaming arrangement with HII's Newport News Shipbuilding in Virginia.
General Dynamics Electric Boat designs, builds, repairs and modernizes nuclear submarines for the U.S. Navy. Headquartered in Groton, Connecticut, it employs more than 23,000 people. More information about General Dynamics Electric Boat is available at www.gdeb.com.
General Dynamics is a global aerospace and defense company that offers a broad portfolio of products and services in business aviation; ship construction and repair; land combat vehicles, weapons systems and munitions; and technology products and services. General Dynamics employs more than 100,000 people worldwide and generated $42.3 billion in revenue in 2023. More information is available at www.gd.com.
View original content to download multimedia:https://www.prnewswire.com/news-releases/general-dynamics-electric-boat-awarded-1-3-billion-contract-modification-for-long-lead-time-material-for-virginia-class-submarines-302214833.html
SOURCE General Dynamics Electric Boat
Ausgewählte Hebelprodukte auf General Dynamics
Mit Knock-outs können spekulative Anleger überproportional an Kursbewegungen partizipieren. Wählen Sie einfach den gewünschten Hebel und wir zeigen Ihnen passende Open-End Produkte auf General Dynamics
Der Hebel muss zwischen 2 und 20 liegen
Name | Hebel | KO | Emittent |
---|
Name | Hebel | KO | Emittent |
---|
Nachrichten zu General Dynamics Corp.
Analysen zu General Dynamics Corp.
Datum | Rating | Analyst | |
---|---|---|---|
29.03.2018 | General Dynamics Overweight | Barclays Capital | |
26.02.2018 | General Dynamics Outperform | Cowen and Company, LLC | |
26.10.2017 | General Dynamics Hold | Stifel, Nicolaus & Co., Inc. | |
27.04.2017 | General Dynamics Hold | Stifel, Nicolaus & Co., Inc. | |
27.04.2017 | General Dynamics Outperform | RBC Capital Markets |
Datum | Rating | Analyst | |
---|---|---|---|
29.03.2018 | General Dynamics Overweight | Barclays Capital | |
26.02.2018 | General Dynamics Outperform | Cowen and Company, LLC | |
26.10.2017 | General Dynamics Hold | Stifel, Nicolaus & Co., Inc. | |
27.04.2017 | General Dynamics Hold | Stifel, Nicolaus & Co., Inc. | |
27.04.2017 | General Dynamics Outperform | RBC Capital Markets |
Datum | Rating | Analyst | |
---|---|---|---|
24.03.2016 | General Dynamics Hold | Deutsche Bank AG | |
29.01.2015 | General Dynamics Sector Perform | RBC Capital Markets | |
07.01.2015 | General Dynamics Sector Perform | RBC Capital Markets | |
27.04.2012 | General Dynamics equal-weight | Morgan Stanley | |
11.05.2010 | General Dynamics Downgrade | Goldman Sachs Group Inc. |
Datum | Rating | Analyst | |
---|---|---|---|
09.04.2009 | General Dynamics sell | Citigroup Corp. |
Um die Übersicht zu verbessern, haben Sie die Möglichkeit, die Analysen für General Dynamics Corp. nach folgenden Kriterien zu filtern.
Alle: Alle Empfehlungen