General Dynamics Electric Boat awarded $1 billion contract modification for long lead time material for Virginia-class submarines

25.03.25 23:16 Uhr

Werte in diesem Artikel
Aktien

242,10 EUR -3,40 EUR -1,38%

GROTON, Conn., March 25, 2025 /PRNewswire/ -- General Dynamics Electric Boat, a business unit of General Dynamics (NYSE: GD), announced today it has been awarded a $1 billion undefinitized contract modification allowing Electric Boat to purchase long lead time materials for Virginia Class Block VI submarines as detailed in the U.S. Department of Defense contract announcement.

Virginia-class submarine

"This contract modification drives continuation of the crucial demand signal that the submarine industrial base needs to invest in the capacity and materials required to increase production volume," said Mark Rayha, president of General Dynamics Electric Boat. "Consistent funding for the supply base is essential to achieve the high-rate production the Navy requires of the entire submarine enterprise."

Virginia-class submarines are designed from the keel up for the full range of 21st-century mission requirements, including anti-submarine and surface ship warfare and special operations support. General Dynamics Electric Boat is the prime contractor and lead design yard for the Virginia class and constructs them in a teaming arrangement with HII's Newport News Shipbuilding in Virginia.

General Dynamics Electric Boat designs, builds, repairs and modernizes nuclear submarines for the U.S. Navy. Headquartered in Groton, Connecticut, it employs more than 24,000 people. More information about General Dynamics Electric Boat is available at www.gdeb.com.

Headquartered in Reston, Virginia, General Dynamics is a global aerospace and defense company that offers a broad portfolio of products and services in business aviation; ship construction and repair; land combat vehicles, weapons systems and munitions; and technology products and services. General Dynamics employs more than 110,000 people worldwide and generated $47.7 billion in revenue in 2024. More information is available at www.gd.com.

General Dynamics (PRNewsFoto/General Dynamics) (PRNewsFoto/General Dynamics)

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/general-dynamics-electric-boat-awarded-1-billion-contract-modification-for-long-lead-time-material-for-virginia-class-submarines-302411329.html

SOURCE General Dynamics Electric Boat

In eigener Sache

Übrigens: General Dynamics und andere US-Aktien sind bei finanzen.net ZERO sogar bis 23 Uhr handelbar (ohne Ordergebühren, zzgl. Spreads). Jetzt kostenlos Depot eröffnen und als Geschenk eine Gratisaktie erhalten.

Ausgewählte Hebelprodukte auf General Dynamics

Mit Knock-outs können spekulative Anleger überproportional an Kursbewegungen partizipieren. Wählen Sie einfach den gewünschten Hebel und wir zeigen Ihnen passende Open-End Produkte auf General Dynamics

NameHebelKOEmittent
NameHebelKOEmittent
Wer­bung

Nachrichten zu General Dynamics Corp.

Wer­bung

Analysen zu General Dynamics Corp.

DatumRatingAnalyst
29.03.2018General Dynamics OverweightBarclays Capital
26.02.2018General Dynamics OutperformCowen and Company, LLC
26.10.2017General Dynamics HoldStifel, Nicolaus & Co., Inc.
27.04.2017General Dynamics HoldStifel, Nicolaus & Co., Inc.
27.04.2017General Dynamics OutperformRBC Capital Markets
DatumRatingAnalyst
29.03.2018General Dynamics OverweightBarclays Capital
26.02.2018General Dynamics OutperformCowen and Company, LLC
26.10.2017General Dynamics HoldStifel, Nicolaus & Co., Inc.
27.04.2017General Dynamics HoldStifel, Nicolaus & Co., Inc.
27.04.2017General Dynamics OutperformRBC Capital Markets
DatumRatingAnalyst
24.03.2016General Dynamics HoldDeutsche Bank AG
29.01.2015General Dynamics Sector PerformRBC Capital Markets
07.01.2015General Dynamics Sector PerformRBC Capital Markets
27.04.2012General Dynamics equal-weightMorgan Stanley
11.05.2010General Dynamics DowngradeGoldman Sachs Group Inc.
DatumRatingAnalyst
09.04.2009General Dynamics sellCitigroup Corp.

Um die Übersicht zu verbessern, haben Sie die Möglichkeit, die Analysen für General Dynamics Corp. nach folgenden Kriterien zu filtern.

Alle: Alle Empfehlungen

Buy: Kaufempfehlungen wie z.B. "kaufen" oder "buy"
Hold: Halten-Empfehlungen wie z.B. "halten" oder "neutral"
Sell: Verkaufsempfehlungn wie z.B. "verkaufen" oder "reduce"
mehr Analysen